December 30, 2013

ARB Greenride 2014 Test Trail, it is tough for standard riders

It has 4 check points (4 CPs)37 - 40 km, including tarmac & offroad. Let me start reviewing this trail for you guys to enjoy & taste it first hand this coming sunday.

 CP1 Section - "dragon back" trail 
First section to the CP1, riders have to ride on the tarmac on the main road to access Bandar Tasik Puteri from the main road. About half the length in the CP1 section will be on this tarmac, then everyone will be divert into the offroad on the left side. This CP1 section is fun to ride with the average climbing. Only toward the end of the CP1 section, you will be climb & downhill on the "dragon back" trails. This section will consume your energy a lots. I suggest you don't push yourself as you need to use it more in the rest of the trails. Here is the pictures of the "dragon back".

 View from the last peak of the "Dragon Back" - push the bike or you can ride it if you could.